A new fence or a trimmed hedge can look like the simplest of domestic projects. It can also sit at the point where two very different legal systems meet. One is public planning control, administered by the local planning authority. The other is private property law, governed by deeds, registered titles, covenants and the civil courts. Confusing the two is a common and costly error.

A planning permission, where one is needed, does not authorise a trespass. It does not override a restrictive covenant. It does not settle who owns the strip of land beneath the fence posts. Conversely, a title plan that appears to support a boundary line does not make a two-metre close-boarded fence lawful in planning terms. The two questions must be answered separately.

Planning control starts with the dwellinghouse

For many houses, boundary treatment benefits from permitted development rights. The General Permitted Development Order contains a class for gates, fences, walls and other means of enclosure. In broad terms, a fence or wall may be erected without a planning application if it is no more than two metres above ground level. Where it is within one metre of a boundary with a highway, the usual limit is one metre. Measurement is from the natural ground level, and the local authority will look at the whole structure, including any raised plinth or trellis that adds to its height.

Those figures are a starting point, not a universal answer. Permitted development rights can be withdrawn by an Article 4 direction, by a condition attached to an earlier planning permission, or by the specific circumstances of the site. A house on an estate with aDesign Code, or one subject to a condition requiring boundary details to be approved, may need consent even for a modest fence. The planning history of the property is therefore part of the boundary enquiry.

Where conservation areas and listed buildings change the answer

Conservation area status does not make every fence unlawful, but it does narrow the permitted development envelope and increases the weight given to local design policies. Some conservation areas are subject to Article 4 directions that remove rights for boundary works. Others are covered by local guidance on hedges, walls and front garden treatment. A planning officer will expect the proposal to respect the character and appearance of the area, and may require details of materials and height before granting consent.

Listed buildings introduce a separate consent regime. Works of alteration that affect the character of a listed building as a building of special architectural or historic interest require listed building consent. Boundary walls can themselves be listed, or can fall within the curtilage of a listed building. A new fence in the grounds may also affect the setting of the listed building and be material to a planning decision. The fact that a fence is timber and could later be removed does not automatically take it outside these considerations.

Hedges are treated differently from fences

A hedge is not simply a fence made of leaves. In England and Wales, the high hedges provisions of Part 8 of the Anti-social Behaviour Act 2003 allow a local authority to consider complaints about evergreen or semi-evergreen hedges that exceed two metres in height and affect a domestic property. The process is not a planning application. It is a complaints mechanism, and the authority will normally expect the parties to have attempted to resolve the matter first. A remedial notice can require the hedge to be reduced and maintained at a specified height.

In Scotland, the High Hedges (Scotland) Act 2013 provides a separate route. In neither jurisdiction does high hedges legislation determine ownership of the boundary or grant a right to cut a neighbour’s hedge. It addresses the effect of the hedge, not the location of the title line.

The title plan is not a construction drawing

Registered title plans are general boundaries. The red line on a title plan is indicative; it shows the extent of the registered estate, not usually the precise position of every boundary. The exact line may depend on the conveyance, the transfer plan, historic measurements, physical features and the way the land has been used. An HM Land Registry determined boundary application can fix the line, but that is a separate process with its own evidential requirements.

This matters before work begins. A homeowner may believe the fence is on their land because the title plan suggests so, while the neighbouring title or an old conveyance plan suggests otherwise. A planning officer will not adjudicate that dispute. Planning decisions are concerned with the development and its effects, not with the civil ownership of the soil. Advice from the planning department is no substitute for legal and survey evidence on the boundary itself.

Covenants and estate controls sit outside planning

Restrictive covenants are private obligations. They may limit the height of fences, require approval of materials, prevent front boundary walls, or require consent from a neighbouring landowner or management company. A covenant can bind even where planning permission is not needed. Breach can lead to an injunction or a claim for damages, and a planning consent will not cure it.

Before committing to boundary works, the title register and any transfer or conveyance should be reviewed for covenants, easements and estate management provisions. The local land charges register may also reveal relevant restrictions. If consent is required under a covenant, it should be obtained in writing and kept with the project file.

A practical order of checks

Start with the land, not the fence. Establish the likely boundary line from the registered title, any plans and a site survey. Then review the deeds for covenants and rights. Next, check the planning position: permitted development limits, any Article 4 direction, conservation area status, listed building issues, planning conditions and local design policies. If the proposal concerns an existing hedge and a neighbour dispute, consider the high hedges route separately. Only then should works be ordered or an application submitted.

A boundary project can be lawful in planning terms and still be a private law problem. It can also be supported by the deeds and still require planning permission. The prudent approach in 2026 is to obtain both answers before the first post is set. The fence may be the visible structure, but the file is what will decide whether it can safely stay there.

All Articles

Related Articles

The Award in the Drawer: Party Wall Notices and the Renovation Risk at Completion

The Award in the Drawer: Party Wall Notices and the Renovation Risk at Completion

Two Keys, One Door: Planning Consent and the Restrictive Covenant Trap in 2026

Two Keys, One Door: Planning Consent and the Restrictive Covenant Trap in 2026

The Skip Behind the Wall: Conservation Area Demolition and the Buyer’s Audit

The Skip Behind the Wall: Conservation Area Demolition and the Buyer’s Audit